NCLT Hyderabad Bench Orders Substantive Consolidation of CIRPs of Panduranga Energy Systems Pvt Ltd and GMP Infrastructure Pvt Ltd

LAW FINDER NEWS NETWORK | |
NCLT Hyderabad Bench Orders Substantive Consolidation of CIRPs of Panduranga Energy Systems Pvt Ltd and GMP Infrastructure Pvt Ltd

Tribunal permits merging of insolvency resolution processes to maximize asset value and ensure efficient, time-bound resolution under IBC, 2016.


In a significant ruling delivered on November 6, 2026, the National Company Law Tribunal (NCLT), Hyderabad Bench, chaired by Mr. Rajeev Bhardwaj (Judicial Member) and Mr. Sanjay Puri (Technical Member), approved the substantive consolidation of the Corporate Insolvency Resolution Processes (CIRPs) of M/s Panduranga Energy Systems Private Limited (PESPL) and M/s GMP Infrastructure Private Limited (GMP). This decision allows the insolvency proceedings of the two interlinked corporate debtors to be merged and managed as a single consolidated CIRP.


The application was filed by the common Resolution Professional (RP), Mr. Kalvakota Venkat Narsinga Rao, following the initiation of insolvency proceedings against both companies by Union Bank of India due to defaults on financial facilities. PESPL is the principal borrower, while GMP stands as the corporate guarantor for the same financial debts amounting to Rs. 2,131.68 crore, with identical financial creditors including Union Bank of India, Indian Bank, and Canara Bank holding the same voting shares and claims in both CIRPs.


The Tribunal observed that the two companies are intrinsically connected by multiple parameters: PESPL's 116 MW gas-based power plant is installed on land leased from GMP; the land itself is mortgaged to secure the financial facilities; both companies share common promoters and management; and the financial debts in both CIRPs arise from the same underlying loan facilities. The plant and machinery of PESPL cannot be resolved independently without GMP's land, and vice versa, as separate resolution plans could cause access issues, asset value erosion, and duplication of costs.


The Committees of Creditors (CoCs) of both CIRPs unanimously supported the consolidation, recognizing that a joint resolution plan would better maximize asset value and ensure an efficient and commercially viable resolution process. The Tribunal, relying on its residuary jurisdiction under Section 60(5) of the Insolvency and Bankruptcy Code, 2016 (IBC), read with Rule 11 of the NCLT Rules, and judicial precedents, permitted the substantive consolidation. The ruling directs that all assets and liabilities of PESPL and GMP be pooled into a single resolution process, with the common RP continuing to oversee the consolidated CIRP.


The order also mandates the formation of a combined CoC to consider resolution plans collectively and allows the RP to issue a fresh invitation for resolution plans (Form G) if necessary. All pending claims and proceedings in the individual CIRPs shall be transferred to the consolidated process.


This ruling underscores the Tribunal's commitment to the core objectives of the IBC - maximizing asset value, facilitating effective reorganization, and ensuring time-bound resolution. It also reflects judicial recognition of the commercial realities of interdependent corporate entities, enabling flexible and pragmatic insolvency solutions.


Bottom Line:

Substantive consolidation of Corporate Insolvency Resolution Processes (CIRPs) of two interdependent corporate debtors permitted to achieve value maximization, effective reorganization, and time-bound resolution under the Insolvency and Bankruptcy Code, 2016.


Statutory provision(s):

Section 25, Section 59A (not yet in force), Section 60(5) of the Insolvency and Bankruptcy Code, 2016; Rule 11 of the National Company Law Tribunal Rules, 2016


Union Bank of India vs M/s. Panduranga Energy Systems Private Limited, (NCLT)(Hyderabad Bench) : Law Finder Doc Id # 3019165